Manufacturing and subcontracting

Bills of materials, workstations, work orders, job cards, and subcontracted operations tied back to stock and cost.

Typical length: 6–14 weeks

Outcome

A work order consumes the right materials, records time at the right workstation, and receives finished goods at a cost finance can explain.

Who it is for

  • Discrete manufacturers with multi-level bills of materials
  • Plants that send operations to subcontractors
  • Teams planning production from sales orders

What is included

Bills of materials
Multi-level BOMs, scrap, and alternate items where engineering agrees. Each BOM has an owner and a revision habit.
Routing
Operations, workstations, and hour rates so job cards capture time and cost, not only quantities.
Work orders
Plan from sales orders or a production plan, reserve materials, transfer to work-in-progress, and receive finished goods.
Subcontracting
Raw materials sent to a subcontractor, finished items received, and the service bill matched to the order.
Quality
Inspection on receipt or on the job card where a failed reading must stop the move.

How the work runs

  1. 01Pick two real productsOne simple, one with a sub-assembly or a subcontracted step.
  2. 02Build the BOM and routingWith engineering and the person who actually issues material.
  3. 03Complete a work order on stagingIssue, job card, finish, and check the stock and cost impact.
  4. 04Train planners and supervisorsSeparate sessions. They do not use the same screens.

Deliverables

  • BOM and routing standards
  • Work order procedure
  • Subcontracting flow where used
  • Sample costing review on the pilot products